Tetra Pak Commissioning Support

Tetra Pak

Commissioning Support


First Product Successfully Received

Problem

Tetra Pak required external resources to support their offering at Synlait for the new wetmix kitchen. 

Solution

DETA provided two fulltime resources who were integrated into the project delivery team, and were responsible for commissioning all services, including CIP, HVAC, and product pumping.

Outcome

DETA remained on site until the project received first product, which was a major milestone for the contract, and our technical problem-solving expertise was well received throughout the entire project.

Industrial plant at dusk with glowing smokestacks, steel structures, and city lights under a cloudy sky
by Jeff Smit 9 June 2026
Move beyond grid constraints. Discover three asset-backed engineering paths to operationalise demand-side flexibility and protect your production uptime.
Industrial refinery at dusk with glowing orange sky and sprawling metal pipes
by Jeff Smit 4 June 2026
Does the government's gas loan scheme actually add up? Jeff Smit breaks down the NZ energy crisis and the real infrastructure barriers stalling industrial transition.
Industrial facility with large metal tanks, rooftop equipment, and a parked truck on a wet lot.
17 May 2026
Volatile diesel prices and declining gas fields are changing the game. Learn why Australasian industry must act now to de-risk CapEx and electrify.
Show More