Sustainable life logo with pale green “de to” text and teal infinity symbol in a circle.

Talley’s Ashburton As-Building Services

Talley's - Ashburton

As-Building Services


Lines As-built, Layout Optimised!

Problem

Talley’s were looking to expand and required as-building services to understand what lines were currently installed and where.

Solution

DETA provided full as-building services for the Talley’s Ashburton site as part of scoping their expansion project at site.

Outcome

To minimise the amount of additional building required, we as-built the existing lines to identify if they could be moved to optimise the layout, and then provided planning assistance to site. DETA uses Revit, a 3D BIM package, to represent the process equipment and make quick changes to the design as required.

Modern glass-fronted farm building beside vineyards under a bright sky
by Jeff Smit • 30 September 2026
Discover the Kiwifruit Post-Harvest Industry decarbonisation programme. Access research reports on natural refrigerants, drop-in replacements, and leak mitigation.
Industrial plant with silver pipelines, workers in safety gear, and large tanks under a clear sky
24 September 2026
Discover how DETA mapped 14.5 PJ of industrial gas demand across NSW manufacturing to create a sector-wide decarbonisation roadmap for SME processors
Bright industrial facility with stainless steel pipes and processing equipment under a skylit ceiling.
by Jeff Smit • 8 September 2026
Discover a practical engineering framework for electrifying process heat in food processing. Minimise peak demand, lower Scope 1 emissions, and secure funding.
Show More