Talley’s were looking to expand and required as-building services to understand what lines were currently installed and where.

Solution

DETA provided full as-building services for the Talley’s Ashburton site as part of scoping their expansion project at site.

Outcome

To minimise the amount of additional building required, we as-built the existing lines to identify if they could be moved to optimise the layout, and then provided planning assistance to site. DETA uses Revit, a 3D BIM package, to represent the process equipment and make quick changes to the design as required.

Industrial plant at dusk with glowing smokestacks, steel structures, and city lights under a cloudy sky
by Jeff Smit 9 June 2026
Move beyond grid constraints. Discover three asset-backed engineering paths to operationalise demand-side flexibility and protect your production uptime.
Industrial refinery at dusk with glowing orange sky and sprawling metal pipes
by Jeff Smit 4 June 2026
Does the government's gas loan scheme actually add up? Jeff Smit breaks down the NZ energy crisis and the real infrastructure barriers stalling industrial transition.
Industrial facility with large metal tanks, rooftop equipment, and a parked truck on a wet lot.
17 May 2026
Volatile diesel prices and declining gas fields are changing the game. Learn why Australasian industry must act now to de-risk CapEx and electrify.
Show More