Talley’s Ashburton As-Building Services

Talley's - Ashburton

As-Building Services


Lines As-built, Layout Optimised!

Problem

Talley’s were looking to expand and required as-building services to understand what lines were currently installed and where.

Solution

DETA provided full as-building services for the Talley’s Ashburton site as part of scoping their expansion project at site.

Outcome

To minimise the amount of additional building required, we as-built the existing lines to identify if they could be moved to optimise the layout, and then provided planning assistance to site. DETA uses Revit, a 3D BIM package, to represent the process equipment and make quick changes to the design as required.

A conveyor belt filled with bottles of soda in a factory.
26 June 2025
Explore strategies to improve manufacturing efficiency, reduce waste, & achieve production excellence through smart optimisation techniques. Contact us!
Two men are looking at a blueprint in front of a solar panel.
20 May 2025
Explore how successful energy audits lead to measurable cost savings and profit growth. Real case studies show the ROI of smarter energy strategies.
A factory with smoke coming out of the chimneys.
by Agency Stack 1 May 2025
Discover how effective energy management boosts efficiency, reduces costs, and drives sustainability in industries. Learn more with DETA.
Show More