Case Study – Hanmer Springs Generation Project

For the past couple of years DETA has been working with Hanmer Springs Thermal Pools and Spa (HSTPS) to make better use of their geothermal methane, which is a byproduct of their pool heating activities. We initially worked with HSTPS to develop some options for what to do with the gas, and in tandem identified that a Capstone turbine would be the best fit for site – the first installation of a turbine generator in New Zealand.

DETA undertook schematic design, and took the project through delivery of the project within an operating site. The result provides HSTPS with upwards of $50,000 per year of generated energy, with a safer, more resilient infrastructure. The project ran about as smoothly as it could (given the contractors hadn’t worked with such a unit before) and we’ve learnt a lot about the system. We’re really pleased to help deliver a great result for HSTPS, and show that this type of technology can be rolled out economically, and successfully, at small scale.
Industrial facility with large metal tanks, rooftop equipment, and a parked truck on a wet lot.
17 May 2026
Volatile diesel prices and declining gas fields are changing the game. Learn why Australasian industry must act now to de-risk CapEx and electrify.
High-voltage electrical substation with power lines at sunrise in a rural landscape
by Agency Stack 14 May 2026
Are $50M GXP upgrades the only answer to NZ’s grid constraints? Discover why "Big Iron" is failing and how Demand-Side Flexibility offers a $3B alternative.
Aerial view of an industrial plant at sunset with a superimposed digital data graph overlaying the facility.
1 April 2026
Discover how the 2026 EECA report identifies a $3B demand-side flexibility opportunity. Learn how industrial sites can avoid $500/MWh peak energy costs.
Show More