Christchurch Boys’ High School Utility Optimisation

Christchurch Boys' High School

Utility Optimisation

15% Savings On Energy Use Identified

Problem

Christchurch Boys High School has rich heritage, still occupying some of the same buildings as they were in 1926. As it can be imagined some of the heating and cooling technologies were out dated and needed upgrading.

Solution

DETA performed a full review of existing and future heating and cooling needs for future development.

Outcome

15% savings on energy use identified including revising HVAC systems, implementing renewable energy and load shedding during times of congestion demand.

Industrial plant at dusk with glowing smokestacks, steel structures, and city lights under a cloudy sky
by Jeff Smit 9 June 2026
Move beyond grid constraints. Discover three asset-backed engineering paths to operationalise demand-side flexibility and protect your production uptime.
Industrial refinery at dusk with glowing orange sky and sprawling metal pipes
by Jeff Smit 4 June 2026
Does the government's gas loan scheme actually add up? Jeff Smit breaks down the NZ energy crisis and the real infrastructure barriers stalling industrial transition.
Industrial facility with large metal tanks, rooftop equipment, and a parked truck on a wet lot.
17 May 2026
Volatile diesel prices and declining gas fields are changing the game. Learn why Australasian industry must act now to de-risk CapEx and electrify.
Show More