Problem

The milk processing plant at Danone Balclutha was not able to cool the milk to the desired set point, which impacted on the rest of the process.

Solution

DETA investigated the process, identified that the chiller plant settings could be optimised, and recommended practical actions for the plant to take, including:


  • Revising PID control parameters
  • Improved trending within SCADA to identify trips quickly
  • Calibrating evaporator exit temperature probes
  • Altering pressure set points

Outcome

Production targets can now be met all year round.

Industrial plant at dusk with glowing smokestacks, steel structures, and city lights under a cloudy sky
by Jeff Smit 9 June 2026
Move beyond grid constraints. Discover three asset-backed engineering paths to operationalise demand-side flexibility and protect your production uptime.
Industrial refinery at dusk with glowing orange sky and sprawling metal pipes
by Jeff Smit 4 June 2026
Does the government's gas loan scheme actually add up? Jeff Smit breaks down the NZ energy crisis and the real infrastructure barriers stalling industrial transition.
Industrial facility with large metal tanks, rooftop equipment, and a parked truck on a wet lot.
17 May 2026
Volatile diesel prices and declining gas fields are changing the game. Learn why Australasian industry must act now to de-risk CapEx and electrify.
Show More