Sustainable life logo with pale green “de to” text and teal infinity symbol in a circle.

Verkerks HTHP

Verkerks

HTHP

Annual Energy Spend Reduced by Almost $240,000 at a Payback < 2.5 Years

Problem

DETA worked with Verkerks and their Ashburton Meat Processors site on energy reporting and efficiency. During an audit, DETA identified an opportunity for a high temperature heat pump at site – the first in New Zealand – to reduce energy costs but also resolve capacity issues site was experiencing. 


Solution

DETA developed the project business case in conjunction with Verkerks and verified the performance of the project upon completion.


Outcome

The unit was installed in 2013 and reduced the sites annual energy spend by almost $240,000 at payback of less than 2.5 years.


Modern glass house with blue accents in a desert landscape at sunset, with distant mountains.
by Jeff Smit 27 July 2026
The AI data centre boom brings $35B in potential NZ investment—and massive grid risk. Here is how PPAs, batteries, and time zones protect our renewable energy
Industrial plant at dusk with glowing smokestacks, steel structures, and city lights under a cloudy sky
by Jeff Smit 9 June 2026
Move beyond grid constraints. Discover three asset-backed engineering paths to operationalise demand-side flexibility and protect your production uptime.
Industrial refinery at dusk with glowing orange sky and sprawling metal pipes
by Jeff Smit 4 June 2026
Does the government's gas loan scheme actually add up? Jeff Smit breaks down the NZ energy crisis and the real infrastructure barriers stalling industrial transition.
Show More