Kraft Heinz Australia Project Identification & Development

Kraft Heinz - Australia

Project Identification & Development

More Than 10% Water and Energy Savings Across the Site

Problem

Kraft Heinz Australia had previously performed energy audits where potential water and energy savings were identified. Kraft Heinz Australia asked DETA to take these potential savings to the next step.

Solution

The next step involved DETA developing and delivering full business cases, for projects that were identified during site energy audits.

Outcome

Copious amounts of savings were produced from the business cases developed at Echuca and Brisbane sites. A major project identified sought to improve condensate recovery significantly, delivering water and energy savings of more than 10% across the site.

Industrial plant at dusk with glowing smokestacks, steel structures, and city lights under a cloudy sky
by Jeff Smit 9 June 2026
Move beyond grid constraints. Discover three asset-backed engineering paths to operationalise demand-side flexibility and protect your production uptime.
Industrial refinery at dusk with glowing orange sky and sprawling metal pipes
by Jeff Smit 4 June 2026
Does the government's gas loan scheme actually add up? Jeff Smit breaks down the NZ energy crisis and the real infrastructure barriers stalling industrial transition.
Industrial facility with large metal tanks, rooftop equipment, and a parked truck on a wet lot.
17 May 2026
Volatile diesel prices and declining gas fields are changing the game. Learn why Australasian industry must act now to de-risk CapEx and electrify.
Show More