Christchurch Engine Centre Industrial Process Waste Reduction

Christchurch Engine Centre

Industrial Process Waste Reduction

90% Industrial Process Waste Reduction Equivalent to 5 Tonnes Per Year of Industrial Process Waste

Problem

Like most engine shops, Christchurch Engine Centre works with some strong chemicals and produces a significant amount of industrial process waste. With a strong corporate push to reduce untreated waste, Christchurch Engine Centre approached DETA Consulting to identify a means of reducing a chromium rich liquid waste stream from site.

Solution

After confirming that there was no local party capable of recycling the waste stream from site, DETA Consulting identified a technical solution using specialised filtration and ion exchange mechanisms. This treated the waste stream and allowed the remaining liquid waste to be put down the drain. This was an off the shelf solution with some small tweaks, and was locally serviced.

Outcome

Reduced industrial process waste by 90%. Achieved future corporate waste reduction targets.

Industrial plant at dusk with glowing smokestacks, steel structures, and city lights under a cloudy sky
by Jeff Smit 9 June 2026
Move beyond grid constraints. Discover three asset-backed engineering paths to operationalise demand-side flexibility and protect your production uptime.
Industrial refinery at dusk with glowing orange sky and sprawling metal pipes
by Jeff Smit 4 June 2026
Does the government's gas loan scheme actually add up? Jeff Smit breaks down the NZ energy crisis and the real infrastructure barriers stalling industrial transition.
Industrial facility with large metal tanks, rooftop equipment, and a parked truck on a wet lot.
17 May 2026
Volatile diesel prices and declining gas fields are changing the game. Learn why Australasian industry must act now to de-risk CapEx and electrify.
Show More