Problem

CCDHB operates two hospitals – Wellington Regional Hospital in Newtown and Kenepuru Hospital in Porirua – as well as the Kāpiti Health Centre at Paraparaumu. As one of NZ’s large energy users they required a pathway to a low emission future as a part of NZ’s commitment to climate change.


Solution

As a part of EECA’s energy transition accelerator programme, DETA was contracted to conduct a study looking in to and identifying investments that could realise CCDHB’s low carbon future. 


Outcome

CCDHB was provided with the opportunity to be on the front-foot for the future, by capitalising on the energy and carbon saving opportunities that are in the pipeline from right now, out to as far out as 2030 and 2050.



Bright industrial facility with stainless steel pipes and processing equipment under a skylit ceiling.
by Jeff Smit 8 September 2026
Discover a practical engineering framework for electrifying process heat in food processing. Minimise peak demand, lower Scope 1 emissions, and secure funding.
Hthp Concept Design & Installation Project | DETA Consulting
by Anne-Maree Ward 7 September 2026
Discover how DETA delivered New Zealand’s first operational EECA GIDI project at ANZCO Foods Canterbury, replacing coal with high-temperature heat pumps.
Modern glass-fronted farm building beside vineyards under a bright sky
by Jeff Smit 25 August 2026
Download the MPI-funded report on natural refrigerant options for NZ kiwifruit coolstores. See how CO2 and ammonia systems cut emissions and cooling costs.