Sustainable life logo with pale green “de to” text and teal infinity symbol in a circle.

Alliance Group Project Management

Alliance Group

Project Management


From Small to Large Projects, We Can help!

Problem

Alliance Group needed a project delivery team that offered a collaborative partnership, has expertise in the meat sector, understands their strategic drivers, and can deliver successful outcomes.

Solution

DETA has taken responsibility for the delivery of many technical productivity improvement projects across the Alliance Group. Initially focussing on energy improvement projects, such as water recycling and hot water management projects, DETA have gone on to deliver major capital projects including deaerator and gearbox replacements for major equipment.

Outcome

DETA is currently engaged to deliver the decarbonisation implementation strategy that we developed during the Energy Transition Accelerator (ETA) programme.

Modern glass house with blue accents in a desert landscape at sunset, with distant mountains.
by Jeff Smit 27 July 2026
The AI data centre boom brings $35B in potential NZ investment—and massive grid risk. Here is how PPAs, batteries, and time zones protect our renewable energy
Industrial plant at dusk with glowing smokestacks, steel structures, and city lights under a cloudy sky
by Jeff Smit 9 June 2026
Move beyond grid constraints. Discover three asset-backed engineering paths to operationalise demand-side flexibility and protect your production uptime.
Industrial refinery at dusk with glowing orange sky and sprawling metal pipes
by Jeff Smit 4 June 2026
Does the government's gas loan scheme actually add up? Jeff Smit breaks down the NZ energy crisis and the real infrastructure barriers stalling industrial transition.
Show More