Alliance Group Levin Hot Water System Upgrade

Alliance Group - Levin

Hot Water System Upgrade

26% Reduction in Thermal Energy Costs With a 1.5 Year Payback on Investment

Problem

DETA undertook a level 2 energy audit at Alliance's Levin site. Through the audit, we identified that the site was consuming twice as much steriliser water as was required.

Solution

We developed a project, using Alliance's capex process, to both reduce the flow of the sterilisers and improve the heat recovery system at site. As part of this, we also included flow metering so that the hot water consumption could be managed and monitored.

Outcome

Thanks to the short payback, we also included upgrades to the hot water system, such as lining a hot water tank, to make the system more robust and reduce ongoing maintenance costs.

Aerial view of an industrial plant at sunset with a superimposed digital data graph overlaying the facility.
1 April 2026
Discover how the 2026 EECA report identifies a $3B opportunity in demand-side flexibility (DSF). Learn how industrial sites can avoid $500/MWh peak energy costs.
Industrial plant with smokestacks against a bright blue sky, some trees in the foreground.
22 February 2026
Is an LNG terminal the solution to NZ’s gas shortage? Discover a smarter energy mix for security, firming power generation, and industrial transition.
Engineers in safety vests pointing at a laptop screen; helmets, notepad, and phone on table.
19 February 2026
Stalled by budget cuts? Learn how to fund industrial efficiency and decarbonisation projects using OpEx savings, Energy Performance Contracts, and 2026 grants.
Show More