Whakatane Mill Utility Optimisation

Whakatane Mill

Utility Optimisation



36 GWh of Annual Energy Savings

Problem

Following an energy audit conducted by DETA in 2016, Whakatane Mill was aware they were consuming too much energy but didn’t have the resources to take the opportunities further.

Solution

DETA became the utility optimisation partner and completed a variety of pump, compressed air and process-based audits, providing the site with some quick wins which were then implemented by a fully supported graduate supplied by DETA.

Outcome

Total annual energy savings of 36 GWh/year were achieved.

Industrial plant at dusk with glowing smokestacks, steel structures, and city lights under a cloudy sky
by Jeff Smit 9 June 2026
Move beyond grid constraints. Discover three asset-backed engineering paths to operationalise demand-side flexibility and protect your production uptime.
Industrial refinery at dusk with glowing orange sky and sprawling metal pipes
by Jeff Smit 4 June 2026
Does the government's gas loan scheme actually add up? Jeff Smit breaks down the NZ energy crisis and the real infrastructure barriers stalling industrial transition.
Industrial facility with large metal tanks, rooftop equipment, and a parked truck on a wet lot.
17 May 2026
Volatile diesel prices and declining gas fields are changing the game. Learn why Australasian industry must act now to de-risk CapEx and electrify.
Show More